DESIGN, SUPPLY, INSTALL – Our motto fits this case study perfectly!

In partnership with Kier Construction, Cornwall County Council and the school caterers we worked from the initial brief through the design, to installation and onto the handover and training of a kitchen for the new school at St.Stephens.

The catering facilities at the new school include:

An all electric production kitchen
Central wash up area
Walk in coldroom
Main food servery with a twin counter system, one hot and one cold
Bespoke ambient counter with customised laminate fronts, Corian solid surfaces and stainless steel beverage back bar.
Mechanical ventilation system with island canopy, mechanical replacement air, heater battery and UV odour control system.

Brannell School – Cornwall
Date

18th August 2017

Category

KITCHENS, SCHOOL KITCHENS