Penryn Campus

Falmouth University

Our latest job for Falmouth University and Midas Construction. We were delighted to bid and win the tender for the new Social Building at Penryn Campus. Shiny new U-shaped bar, Café drop in multi-deck chiller counters and all electric kitchen.

Share this case study:
Facebook
Twitter

Our challenges

Some of the challenges we faced -high degree of accuracy required -U shaped fabricated bar counter, all sections had to be measured and manufactured to a tolerance of less than one degree to ensure correct fit! And they did, much to everyone’s’ relief!

the kitchen

No extract ventilation route available, therefore two Electrolux Skyline Combi Steamers fitted with integral ventilation hoods, to remove steam, condense water and route to the appliance drain.

The last challenge but certainly not the least-the project installed, commissioned and handed over during the November 2020 nationwide lockdown.